office: (209) 472-1822
fax: (209) 472-0802
email: info@kanegeotech.com

Case Study

Project:

Weber Dam Piezometer Installation

Location:

El Dorado County, California

Timeframe:

November - December 2001

Client:

Barnard Construction, Inc. 

Description:

Working with personnel from Barnard Construction, KANE GeoTech, Inc. calibrated and provided oversight for the installation of 16 Geokon Model 4500S vibrating wire piezometers connected to a Geokon Model 4999-16 Terminal Box.

Pictures: