KANE GeoTech, Inc. - A leader in geotechnical engineering.

Foundation Settlement Mitigation and Repair

Location: Stockton, CA Timeframe: 1998 Client: Advantage Construction Description: Differential settlement of masonry block structure resulted in structural distress. Investigated and made recommendations for mitigation and repair.

CONTACT US

Phone:
(209) 472-1822
Fax:
(209) 472-0802
Email:
info@kanegeotech.com

CASE STUDIES

Debris Flow Mitigation
Landslide Mitigation
Rockfall Mitigation
Instrumentation
Debris Flow Mitigation
Additional Case Studies

TDR

We are one of the few firms in the world with expertise in time domain reflectometry (TDR) for landslide monitoring. In fact, Dr. Kane was instrumental in developing the technology for commercial applications to landslides and slope failures. TDR hardware, Field Reflectometer©, and software, TDRPlot©, are available from the company. KANE GeoTech, Inc. uses only quality instruments from reputable manufacturers including the Campbell Scientific TDR100 cable tester.